Quality & Compliance Suite · Module 2 of 4

Q-DS

Realistic inspection durations in SAP QM, derived from your own inspection lot history.

INSPECTION DURATION · DAYSPlanned2 daysActuallab queueLots012345Proposed5 daysConfidenceA
The challenge

Inspection durations are estimated once and rarely revisited. Planning and availability dates rely on a value nobody can trace back to real inspection lots.

What you get
  • Planning and availability dates based on what really happens
  • Lab bottlenecks made visible
  • Less manual review of QM master data
  • Every value traceable to the lots behind it
How it works
From measure to update
01
Measure
Every completed lot, from creation to usage decision
02
Analyze
Remove outliers; fall back to group or plant where history is thin
03
Propose
A realistic duration with a confidence score from A to D
04
Update
Write the confirmed value to the material master
Example
Master data plans 2 days for a raw material at goods receipt. Three out of four lots actually need up to 5 days, mostly waiting in the lab queue. Q-DS proposes 5 days — and shows where the time goes.
In the product
Inspection planning and scheduling view (sample data)
Inspection planning and scheduling view (sample data)
← Previous moduleBatch Release Guardian Next module →Batch Compliance Monitor
Request a Q-DS demo.
Book a demo →

Search

×